|
4-1 Accelerators |
|
|
Linac |
|
|
|
Performance of Electron Gun for SPring-8 Linac |
T. ASAKA |
127
|
|
|
|
New Transport Line for 1GeV Linac |
S. SUZUKI |
129
|
|
|
|
Multi-Channel Correlation Analyzer using Image Process |
H. SAKAKI |
131
|
|
|
|
Automatic RF Conditioning System for SPring-8 Linac |
H. SAKAKI |
133
|
|
|
Synchrotorn |
|
|
|
Conditioning of RF Cavities for the SPring-8 Synchrotron |
H. SUZUKI |
135
|
|
|
|
Power Supplies for Lattice Magnets of the SPring-8 Synchrotron |
K. FUKAMI |
137
|
|
|
|
Beam Diagnostics for the Commissioning of SPring-8 Synchrotron |
T. AOKI |
139
|
|
|
|
Synchrotron Control System |
N. HOSODA |
141
|
|
|
|
Construction of the Control System for the SPring-8 Synchrotron |
N. TANI |
143
|
|
|
Storage Ring |
|
|
|
Calibration of the Storage Ring Magnets and their Power Supplies |
J. OHNISHI |
145
|
|
|
|
Steering Magnets for the SPring-8 Storage Ring |
K. KUMAGAI |
147
|
|
|
|
Magnet Horizontal Survey before the Storage Ring Commissioning |
C. ZHANG |
149
|
|
|
|
Elevation Changes of the Storage Ring Magnets |
S. MATSUI |
151
|
|
|
|
The Result of the Vibration Measurement for the SPring-8 Storage Ring |
K. HASEGAWA |
154
|
|
|
|
Final Inspection and Test Operation of the SPring-8 SR Main Magnets' Power Supplies |
H. TAKEBE |
156
|
|
|
|
Present status of RF cavity vacuum system |
H. EGO |
159
|
|
|
|
RF Low Power System for the Strage Ring |
Y. OHASHI |
161
|
|
|
|
How to make beam-filling patterns in the storage ring |
Y. KAWASHIMA |
164
|
|
|
|
Computer Control of RF system |
T. OHSHIMA |
166
|
|
|
|
Beam Abort System for The SPring-8 Storage Ring |
T. TAKASHIMA |
168
|
|
|
|
Simulation Study of Single Bunch Instabilities in the SPring-8 Storage Ring |
T. NAKAMURA |
170
|
|
|
|
Possible Methods for Cure of Multi-Bunch Instabilities in the SPring-8 Storage Ring |
T. NAKAMURA |
172
|
|
|
|
Position Measurement of Beam Position Monitor for Magnetic Center of Sextupole |
M. MASAKI |
175
|
|
|
Others |
|
|
|
A New Concept for Photon Beam Monitoring |
T. KOBAYASHI |
177
|
|
4-2 Experimental Facilities |
|
|
Insertion Devices |
|
|
|
Latest Progress of the Development of an In-Vacuum Minipole Undulator |
T. TANABE |
178
|
|
|
|
Rotating Coil / Helmholtz Coil Magnetic Measurement System Using Lock-in Amplifier Method |
T. TANABE |
180
|
|
|
|
Design Status of a Double Array Undulator Control System |
Y. HIRAMATSU |
182
|
|
|
|
Design of Vacuum Chamber at Variably Polarizing Undulator Section |
T. BIZEN |
185
|
|
|
|
Design of Beam Position Monitoring System for a Local Bump Feedback at Variably Polarizing Undulator Section |
T. BIZEN |
187
|
|
|
|
Design of Magnet System for a Local Bump Feedback at Variably Polarizing Undulator Section |
T. BIZEN |
189
|
|
|
Front Ends |
|
|
|
Design of a Pre Slit for the SPring-8 Undulator Beamlines (2) |
S. TAKAHASHI |
191
|
|
|
|
Front End XY-Slits for the SPring-8 Undulator Beamlines |
M. OURA |
194
|
|
|
|
Thermomechanical Analysis of Front End XY-Slits for the SPring-8 Undulator Beamlines |
M. OURA |
197
|
|
|
|
Signal Operation System for X-ray Beam Position Monitors |
T. KUDO |
200
|
|
|
|
Present Status of X-ray Beam Position Monitors for ID Beamlines |
H. AOYAGI |
202
|
|
|
|
Present Status of Interlock X-ray Monitors |
H. AOYAGI |
204
|
|
|
Detectors |
|
|
|
Development of MicroStrip Gaseous Chamber for Realtime X-ray Imaging Detector |
H. TOYOKAWA |
205
|
|
|
|
Evaluation of a prototype Imaging Plate reader which utilizes line-shaped laser beam and CCD |
Y. KAWANO |
208
|
|
|
|
A Multiple CCD X-ray Detector and its Basic Characterization |
M. SUZUKI |
210
|
|
|
Optics |
|
|
|
Bent Crystal Monochromators for High Energy Synchrotron Radiation (II) |
H. YAMAOKA |
213
|
|
|
|
Ultraprecision Polishing of CVD-SiC Mirrors |
M. OHMAE |
215
|
|
|
|
Ultraprecision Form Control of Aspheric Mirror with ELID Grinding |
S. MORIYASU |
218
|
|
|
|
Hard X-ray Focusing by High-Reflectivity Non-Planar Supermirrors |
Y. KOHMURA |
220
|
|
|
|
X-ray Scattering from Nonideal CZ Silicon Crystals for High Energy Synchrotron Radiation |
H. YAMAOKA |
222
|
|
|
Others |
|
|
|
Beamline Control System |
T. OHATA |
225
|
|
|
|
SPring-8 Insertion Device Control System |
T. TANABE |
228
|
|
|
|
Standard Components for Transport Channel of SPring-8 Beamlines |
S. GOTO |
230
|
|
|
|
Alignment of Transport Channel of SPring-8 Beamlines |
S. GOTO |
233
|
|
|
|
High Speed Interlock System for the SPring-8 Beamline |
T. KUDO |
235
|
|
|
|
Construction of SPring-8 Beam line Hutches |
H. YAMAOKA |
237
|
|
|
|
Present Status of RIKEN Beamline II for Structural Biology (BL44B2) |
S. ADACHI |
239
|
|
4-3 Synchrotron Radiation Experiments |
|
|
Experimental Setup for the Study of Photo-absorption Processes of Multiply Charged Ions |
M. OURA |
241
|
|
4-4 Others |
|
|
Present Status of the Information Network System for SPring-8 |
H. TAKEBE |
243
|
|
|
Overview of New SUBARU |
New SUBARU Project Team |
246
|